Rehabilitation of reversible hydro power plant at Bajina Bašta

Project

Rehabilitation of reversible hydro power plant at Bajina Bašta

Rehabilitation of Reversible Hydro Power Plant at Bajina Bašta, Toshiba, execution of works on generator, rotor and stator refurbishment, testing of the equipment, measurements before and during disassembly of generator.

Scope

Scope handled

  • Pre bid phase/process (forming of local consortium and preparation of budgetary offers)
  • Negotiation and bid preparation process (acting as a lead to local consortium in negotiation process, complete preparation and support regarding public procurement law)
  • Execution phase (monitoring and coordination of local portion of works)

Key features

  • Works on revitalization of Unit 1 and revitalization of Unit 2
  • Replacement of key components of turbine, hydromechanical and electrical equipment
  • Works on generator, rotor and stator refurbishment, testing of the equipment, measurements before and during disassembly of generator.

Project highlights

The operating life of the power plant is extended for the next 20-25 years. With revitalization of both reversible pump turbines, installed capacity is boosted to 315 MW, ranking among the highest capacity per pump-turbine in the entire EMEA region

On site

Gallery

  • Rehabilitation of reversible hydro power plant at Bajina Bašta — photo 1
  • Rehabilitation of reversible hydro power plant at Bajina Bašta — photo 2
  • Rehabilitation of reversible hydro power plant at Bajina Bašta — photo 3
  • Rehabilitation of reversible hydro power plant at Bajina Bašta — photo 4

Planning something comparable?

Send us a project inquiry — the market is pre-selected. Drawings and documents go by e-mail.