
Project
Construction of the Torlak BSL‑3 diagnostic & research facility
Construction of a new diagnostic and research facility with a Biosafety Level 3 (BSL‑3) laboratory at the Torlak Institute of Virology, Vaccines, and Serums in Belgrade, Serbia.
Scope
Key Features
- Turnkey contract with the objective of delivering the following work packages: Cleanroom, Cleanroom Flooring, Mechanical, HVAC, Electrical, Automation, Environmental Monitoring System, and Facility Qualification Preparation.
- All work packages include installation, start-up, and commissioning of the relevant equipment.
- The panel system, including all penetrations, is certifiable in accordance with VDI 2083‑19:2019, leak‑tightness class 4, and designed to maintain integrity under pressure fluctuations up to ±1000 Pa.
- Ceilings consist of cleanroom panels mounted on a metal substructure, with appropriate inspection openings allowing access to utilities and installations.
- Within the BSL‑3 laboratory, water supply and drainage for the autoclave are provided.
- All internal doors are aluminium with steel frames. The entire BSL‑3 area, including the containment zone, is finished with a homogeneous PVC flooring layer featuring enhanced wear and chemical resistance, including resistance to hydrogen peroxide and other disinfectants.
Total BSL‑3 Area: 163 m²
Cleanroom Area: 715 m²
Total Panel Quantity: 3,140 m² (2,180 m² wall panels + 960 m² ceiling panels)
Project Highlights
This project represents the construction of the first diagnostic laboratory facility with Biosafety Level 3 in the Republic of Serbia. The facility is designed to meet all requirements for handling pathogenic agents that necessitate this biosafety level, including SARS‑CoV‑1, yellow fever virus, West Nile virus, eastern equine encephalitis virus, and MERS‑CoV, as well as various bacterial, fungal, and rickettsial pathogens.
The project is implemented by the Ministry of Health of the Republic of Serbia, through its Project Coordination Unit.
DECO Pulse
Read more about this project
Comparable projects
Related projects
CompletedRenewable energy
Rehabilitation of reversible hydro power plant at Bajina Bašta
Toshiba International · Serbia · 2024 - 2026
DECO scope: Consulting & Planning, Project & Construction Management
OngoingNon-renewable energy
Reconstruction and construction of the fire protection system
Pančevo Oil Refinery, NIS · Serbia · 2024-2027
DECO scope: Project & Construction Management, Equipment Procurement & Installation Services
CompletedNon-renewable energy
Flue gas desulphurization construction project for Nikola Tesla B (FGD TENT B) thermal power plant
Mitsubishi Power / EPS · Serbia · 2020-2025
DECO scope: Consulting & Planning, Engineering & Design, Project & Construction Management, Equipment Procurement & Installation Services
Planning something comparable?
Send us a project inquiry — the market is pre-selected. Drawings and documents go by e-mail.




